| Implementation of a complex audio visual project typically involves multiple
disciplines and very detailed procedures. |
| |
| Engineering Phase |
Specification
of equipment related to the AV system and provide related cut-sheets and
descriptions |
Definition of
base-building infrastructure requirements including conduit requirements,
structural and blocking requirements, etc. |
Calculation
of system mechanical requirements including heat loads, power requirements,
LAN requirements, etc. |
Drafting of
all AV drawings in AutoCAD |
AV Floor Plan |
AV Ceiling Plan |
AV Conduit Riser |
AV Flow Diagrams |
Provide required
coordination documentation to necessary parties |
| |
| Project Management |
Maintain project
status reports |
Develop project
timeline including cross trade coordination |
On site coordination
of construction related issues with on-site trades |
Attend scheduled
project meetings |
Track products
and schedule delivery of product to site |
Facilitate the
creation of user's manuals and equipment documentation |
Perform system
testing |
Facilitate end-user
training |
| |
| Hardware Installation (off site) |
Fabricate equipment
racks |
Burn in equipment |
Test signal
paths |
Preliminary
test of control program |
| |
| Hardware Installation (on site) |
AV cable terminations |
Mounting of
AV devices including projectors, plasma displays etc. |
Functional systems
testing |
Site clean up
and disposal etc. |
| |